ADOT 206 Electrical Upgrades

Scope of Work

  • Change out existing 2000 amp SES and motor control center
  • Install 2-400 amp distribution centers
  • Change out multiple branch panels

Top Achievement

  • operate with EXCELLENCE | “We will maximize productivity and minimize risk through proper planning.” – Through communication, coordination, investigation, and pre-planning, we effectively and safely executed a building shut-down during off-hours. We overcame unforeseen conditions, and through communication with the owner and engineer were able to adjust and ensure that the building was brought to code and fully operational on Tuesday morning after a 3-day weekend.
Owner
Arizona Department of Transportation
Delivery Method
Job Order Contracting
Location
Phoenix, AZ
Markets
Job Order Contract
Services
Fabrication
Electrical Construction
Status
Ongoing