Scope of Work
- Completion of low lift booster station
- 2 additional submersible pumps including new MCC and VFD
- Added high lift booster station – new filtration unit, 2 high lift vertical turbine pumps, new MCC, VFDs, harmonic filter, and instrumentation & controls
- New lift station and bridge crane
Top Achievement
- champion INNOVATION | “We will be a think tank, share information within the industry, and put ideas into action.” – We overcame many installation obstacles; we redesigned solutions for existing conditions and keep within budget
Top Challenge & Solution
- The harmonic filter had to be removed from the MCC due to size constraints; we had to relocate the filter into the existing electrical room
- Owner
- City of Clovis
- General Contractor
- Smithco Construction
- Location
- Clovis, NM
- Markets
- Industrial
- Services
- Electrical Construction
- Completion Date
- March 2017