City of Clovis Reuse System Phase 1B

Scope of Work

  • Completion of low lift booster station
  • 2 additional submersible pumps including new MCC and VFD
  • Added high lift booster station – new filtration unit, 2 high lift vertical turbine pumps, new MCC, VFDs, harmonic filter, and instrumentation & controls
  • New lift station and bridge crane

Top Achievement

  • champion INNOVATION | “We will be a think tank, share information within the industry, and put ideas into action.” – We overcame many installation obstacles; we redesigned solutions for existing conditions and keep within budget

Top Challenge & Solution

  • The harmonic filter had to be removed from the MCC due to size constraints; we had to relocate the filter into the existing electrical room
Owner
City of Clovis
General Contractor
Smithco Construction
Location
Clovis, NM
Markets
Industrial
Services
Electrical Construction
Completion Date
March 2017