Tempe South Water Treatment Plant

Scope of Work

  • 1 MW photovoltaic solar system installation
  • Fixed tilt system

Achievements

  • champion INNOVATION | heavy use of fabrication
  • operate with EXCELLENCE | 3,132 solar modules; 261 strings;  20 combiner boxes,;8 disconnects; 2 inverters; 1 transformers, 1 utility switchgear

Challenges

  • champion INNOVATION | photovolatic solar system
Owner
City of Tempe
General Contractor
SolarCity
Location
Tempe, Arizona
Markets
Renewable Energy
Services
Virtual Construction
Fabrication
Electrical Construction
Completion Date
January 2014