Tucson Air Traffic Control Tower

Scope of Work

  • All site work, low and medium voltage electrical, and other electrical construction
  • Support building and new air traffic control tower
  • BIM / 3D modeling of entire electrical portion

Achievements

  • build TRUST | widespread coordination with owner, designer, and constructor
  • champion INNOVATION | extensive use of virtual construction and fabrication
  • champion INNOVATION | modeling alleviated congestion on-site during construction

Challenges

  • operate with EXCELLENCE | restrictions on a federal project
  • build TRUST | coordination with multiple end users and trades
Owner
Federal Aviation Administration
General Contractor
Hensel Phelps
Delivery Method
Design Assist
Location
Tucson, Arizona
Markets
Aviation & Transportation
Services
Virtual Construction
Fabrication
Electrical Construction
Electrical Service
Completion Date
August 2015