UA Tech Park

Scope of Work

  • 6.6 MW utility solar array installation
  • 23,744 solar modules; 1,148 strings;  72 combiner boxes; 6 recombiner boxes; 6 inverters; 7 transformers, 1 utility switchgear
  • Single-axis tracker system

Top Achievement

  • operate with EXCELLENCE | “We will be the experts in our field, know what is required, and do more.” – successful installation of 6.6 MW utility solar array

Challenges

  • champion INNOVATION | “We will embrace and implement technology that brings sustainability to the marketplace.” – leveraged our experience working on various renewable energy projects to ensure successful solar array system installation
Owner
E.ON Climate & Renewables
General Contractor
Mortenson Construction
Location
Tucson, Arizona
Markets
Renewable Energy
Services
Virtual Construction
Electrical Construction
Completion Date
July 2013