Waste Management CNG Tucson
Scope of Work
- Installed new gas detection system in the 8-bay truck maintenance shop, including adding shunt trip functions to all existing electrical panels
- Installed new 1200 amp SES to serve the CNG equipment
- Installed 3,000 feet of exposed Class 1 Division 1 rigged conduit used for fueling stations, flame detection cameras, and EPO buttons
Achievements
- champion INNOVATION | provided solutions, allowing us to leverage previous experience in a new market
Challenges
- build TRUST | several coordination meetings to make sure that our electrical underground did not come in conflict with other trades for joint trenching and compound yard underground work
- build TRUST | communicated concerns and collaborated with the end user to gain access to occupied shop areas to ensure completion on fast track schedule
- Owner
- Waste Management
- General Contractor
- ET Environmental
- Location
- Tucson, Arizona
- Markets
- Industrial
- Services
- Electrical Construction
- Completion Date
- October 2016